ifix.sg › HDB shop renovation cost Singapore
HDB Shop Renovation Cost Singapore (2026): Shophouse and Commercial Unit Prices
Short answer: For HDB shophouses and HDB commercial units, published 2026 guides put a strip-and-rebuild for a new tenant at about S$30,000–S$80,000, and basic heartland shop fit-outs at about S$80–S$120 per sq ft. HDB approval through a Qualified Person, typically about 14 working days for A&A works, must come before work starts.
How much does it cost to renovate an HDB shop in 2026?
This guide covers HDB commercial premises only: HDB shophouses, shops in HDB estates and units in HDB shopping and office complexes. It does not cover residential flats. HDB shops follow their own approval rules on top of the usual commercial renovation costs.
The ranges below come from publicly published Singapore guides. They are indicative ranges from other firms, not a ifix.sg quotation, and usually exclude GST and equipment.
| HDB shop job | Indicative price | Source |
|---|---|---|
| HDB shophouse takeover: strip and rebuild for a new tenant | S$30,000–S$80,000 (about 3–5 weeks) | [6][7] |
| HDB shophouse and strata shops, typical band | S$25,000–S$70,000 | [7] |
| Quick refresh of an existing shop: repaint, lighting, signage swap | S$8,000–S$20,000 | [7] |
| Strata shop refresh: existing layout, new finishes and lighting | S$15,000–S$40,000 | [6] |
| Basic retail fit-out, kiosks and heartland shops | S$80–S$120 per sq ft | [6] |
| Mid-range retail fit-out | S$120–S$180 per sq ft | [6] |
We found no HDB-specific per-sq-ft survey. The per-sq-ft rows are general retail figures that one published guide says cover heartland shops [6]. Our price for your HDB shop is quote on request. If your shop will be a clinic, salon, tuition centre or F&B outlet, the trade-specific works usually cost more; see the related guides below.
Send your HDB shop address, unit size, trade and target opening date on WhatsApp for a site assessment and itemised quote.
Get my HDB shop renovation quoteWhat approvals does an HDB shop renovation need?
HDB prior approval
Under the Tenancy Agreement for rental shops, or the Memorandum of Lease for sold shops, shop tenants and owners must get HDB's prior approval before fitting-out works start [2]. HDB says this avoids the cost and time of undoing works that are not permitted [2].
Qualified Person and CORENET submission
Renovation applications must be made by a Qualified Person (QP), a registered architect or professional engineer. The QP submits through CORENET and obtains clearances from HDB, BCA and the Fire Safety and Shelter Department (FSSD) before work starts [1][2]. For units in HDB shopping and office complexes, HDB asks you to approach the managing agent [1].
Processing times and the Notice of Alteration
HDB's published processing times are [1]:
| Type of work | Procedure | Processing time |
|---|---|---|
| A&A works on the lodgement works list | CORENET submission by QP for clearance with HDB | About 7 working days (subject to review) |
| Other A&A works | CORENET submission by QP for clearance with HDB | About 14 working days (subject to review) |
| Items on the exemption list | No application | — |
In every case, works involving hacking or laying wall or floor tiles need a Notice of Alteration (NOA) before they start [1]. Lodgement works and A&A items involving hacking can only begin after HDB approval [1].
HDB-registered contractors
HDB's renovation guide requires alteration and addition works to use licensed contractors listed in HDB's Directory of Renovation Contractors [2].
Change of trade and change of use
The trade you run is part of your HDB tenancy. Changing the trade or tenancy details of an HDB commercial property is a separate application through GoBusiness [4]. HDB also publishes guidance on change of use and permissible trades for its shops [3]. Confirm the new trade is approved before you renovate for it.
Fire safety
Fire safety works, such as layout changes affecting escape routes or fire compartments, need SCDF plan approval unless exempt or lodged as minor works [8]. For HDB shops, the QP's CORENET submission includes the FSSD clearance [2].
What does an HDB shop fit-out usually include?
Published shop renovation scopes cover the shopfront, signage, lighting, display joinery, flooring, partitions and the POS counter [7]. A takeover also includes strip-out of the previous tenant's fit-out, debris disposal and making good before the new works [6][7]. Depending on your trade, add:
- F&B: exhaust, grease trap, gas and food-shop layout (F&B guide)
- Clinic: infection-control finishes, sterilisation room and plumbing (clinic guide)
- Salon: wash basins, water heaters, waterproofing and high-load power (salon guide)
- Tuition centre: classroom partitions, acoustics and fire safety (tuition centre guide)
What drives HDB shop renovation cost?
- Condition of the unit. Taking over a unit and stripping it out costs more than refreshing an existing layout [6][7].
- Your trade. F&B, clinic and salon trades need more plumbing, exhaust and electrical work than dry retail.
- Shopfront and signage. Shopfront works and signboards add cost. Works affecting the shopfront need HDB approval [6][7].
- Hacking and tiling. These trigger the NOA and often need more labour and debris disposal [1].
- Professional fees. The QP's submissions are usually priced separately from the contractor's works.
How long does an HDB shop renovation take?
Allow for HDB approval first, about 7–14 working days depending on the work type [1]. Then construction: one contractor gives about 3–5 weeks for an HDB shophouse takeover [7]. Trade-specific approvals, such as an SFA licence for food shops, add more time.
How can you keep HDB shop renovation costs down?
- Check the approved trade first, before signing or renovating [3][4].
- Keep existing tiles where possible. Avoiding hacking avoids the NOA and its labour [1].
- Reuse the existing layout and services for a refresh rather than a full strip-out [6].
- Use an HDB-registered contractor so approvals aren't delayed [2].
- Get itemised quotes that separate QP fees, works and signage.
What happens at the end of an HDB shop tenancy?
When the tenancy ends, HDB's guidance requires you to return the premises as required, including removing furniture, fixtures and fittings [5]. Plan the reinstatement cost from day one. A published guide puts shophouse reinstatement at S$8–S$25 per sq ft (S$4,000–S$12,500 for a 500 sq ft unit), citing MCSG [6]. MCSG separately lists retail and mall reinstatement at S$15–S$25 per sq ft [9]. For a full breakdown of commercial reinstatement costs, see our reinstatement cost Singapore guide [10].
Related renovation cost guides
Also see the clinic, salon, tuition centre and F&B guides, the commercial renovation cost guide and the partition wall cost guide.
Why talk to ifix.sg?
ifix.sg is a brand of Trends Interior Design Pte Ltd (UEN 200408913Z), a commercial-only renovation contractor since 2004, with in-house electrical, partition, ACMV and carpentry trades. We give an itemised quote after a site assessment. WhatsApp +65 9863 5364.
Send your HDB shop address, unit size, trade and target opening date on WhatsApp for a site assessment and itemised quote.
Get my HDB shop renovation quoteFrequently asked questions
How much does it cost to renovate an HDB shop?
Published 2026 figures include S$30,000–S$80,000 for an HDB shophouse strip and rebuild for a new tenant [6][7], and S$25,000–S$70,000 as the typical band for HDB shophouse and strata shops [7]. These are indicative ranges. ifix.sg quotes on request.
What is the cost per square foot for an HDB shop fit-out?
We found no HDB-specific per-sq-ft survey. General retail guides list basic fit-outs for kiosks and heartland shops at S$80–S$120 per sq ft and mid-range at S$120–S$180 [6].
Do I need HDB approval to renovate my shop?
Yes. Under the tenancy agreement or lease, shop tenants and owners must get HDB's prior approval before fitting-out works. A Qualified Person submits through CORENET, and works can only start after clearance [1][2].
How long does HDB approval take?
HDB lists about 7 working days for works on the lodgement list and about 14 working days for A&A works, subject to review. Items on the exemption list need no application, but hacking or tiling still needs a Notice of Alteration [1].
Do I need an HDB-registered contractor?
HDB's renovation guide says alteration and addition works must use licensed contractors listed in HDB's Directory of Renovation Contractors [2].
Can I change the trade of my HDB shop?
Changing trade or tenancy details of an HDB commercial property is a separate application made through GoBusiness [4]. Confirm the trade is allowed before you renovate.
How long does an HDB shophouse renovation take?
One contractor gives about 3–5 weeks for an HDB shophouse takeover, plus HDB approval time [7][1].
What do I need to do at the end of the HDB shop tenancy?
HDB's guidance on terminating a tenancy covers returning the premises as required, including removing fixtures and fittings [5]. Published shophouse reinstatement rates are S$8–S$25 per sq ft for a 500 sq ft unit [6]. See the reinstatement cost guide.
Send your HDB shop address, unit size, trade and target opening date on WhatsApp for a site assessment and itemised quote.
Get my HDB shop renovation quoteSources
Prices are indicative ranges published by the sources below, not a ifix.sg quotation. Our own prices are quote on request after a site assessment. GST, equipment and authority fees are excluded unless stated.
- HDB, “Addition & Alteration (A&A) Works” (shops and offices) — https://www.hdb.gov.sg/shops-and-offices/managing-an-hdb-shop-or-office/renovation/addition-alteration-aa-works (accessed 5 Nov 2026)
- HDB, “Renovation Guide for Shop Tenant/Owner” (PDF, Dec 2025) — https://www.hdb.gov.sg/-/media/shops-and-offices/managing-an-hdb-shop-or-office/renovation/Renovation-Guide-for-shop-tenant-and-owner-Dec-2025R2.pdf (accessed 5 Nov 2026)
- HDB, “Renovating an HDB Shop or Office” — https://www.hdb.gov.sg/shops-and-offices/managing-an-hdb-shop-or-office/renovation (accessed 5 Nov 2026)
- GoBusiness, “Apply to Rent Out or Change Tenancy of HDB Commercial Properties” — https://licensing.gobusiness.gov.sg/licence-directory/hdb/apply-to-rent-out-or-change-tenancy-of-hdb-commercial-properties (accessed 5 Nov 2026)
- HDB, “Terminate Tenancy of HDB Shop or Office” — https://www.hdb.gov.sg/shops-and-offices/managing-an-hdb-shop-or-office/terminate-tenancy (accessed 5 Nov 2026)
- SG Directory, “Retail Shop Renovation Cost Singapore (2026)” — https://sgdirectory.com/guides/retail-shop-renovation-cost-singapore/ (accessed 5 Nov 2026)
- FixMove, “Shop Renovation Singapore” — https://www.fixmove.sg/shop-renovation-singapore.html (accessed 5 Nov 2026)
- SCDF, “Plan Approval” — https://www.scdf.gov.sg/fire-safety-services-listing/plans-submission-process/plan-approval (accessed 5 Nov 2026)
- REINSTATE.by MCSG, “Singapore Reinstatement Pricing 2026” — https://reinstate.sg/pricing.html (accessed 5 Nov 2026)
- ifix.sg, “Reinstatement Cost Singapore (2026)” — https://ifix.sg/reinstatement-cost-singapore/ (accessed 5 Nov 2026)